Skip to main content

Table 3 Rail

From: Estimating the contribution of infrastructure to national productivity in Europe

 

Main

Human capital

Tax

Trade

Investment

0.2778

0.3799

0.33

0.1859

Population growth

−1.264

−0.817

−0.2645

0.5313

Human capital

-

0.2451

-

-

Trend

0.0286

0.0248

0.0266

0.0214

AT (Possibly over-investing)

−0.0371 ++ (19)

−0.1783* ++ (13)

−0.0446 ++ (19)

−0.0950* ++ (19)

BE

−0.4400 (15)

−0.4742 (15)

−0.7023** (15)

−0.1781 + (15)

BG

−0.1561 (17)

0.3305 ++ (12)

−0.1735 (17)

−0.1543 (17)

CH

1.9715 + (8)

-

0.9680** (7)

3.0551** (8)

CY

-

-

-

-

CZ

0.1838 + (18)

0.9754 (13)

−0.2515 ++ (16)

0.0968 + (18)

DE

0.0081 ++ (21)

0.0044 ++ (20)

0.0220 (21)

−0.0244 +++ (21)

DK

0.0706 + (7)

0.0564 (7)

-

−0.0009 (7)

EE

0.0550 ++ (19)

0.0837 + (14)

0.0887 + (17)

0.0621 +++ (19)

EL

0.4771 (9)

0.2664 (9)

0.2576 (9)

0.4051 (9)

ES

-

-

-

-

FI

0.1868 (23)

1.9804* (17)

−0.1481 (23)

−0.2717 (23)

FR (Over-investing)

−0.7484*** ++ (17)

−0.7686*** ++ (17)

−0.5812** ++ (17)

−0.1676 ++ (17)

HU

0.1132 (15)

0.0473 (13)

0.0064 (15)

0.4343 (15)

IE (Possibly under-investing)

2.9662*** (14)

1.4312 ++ (14)

1.3474 + (14)

1.3969** +++ (14)

IT (Possibly over-investing)

−0.5229 +++ (17)

−0.5323 +++ (17)

−0.7696* +++ (17)

−0.4848* +++ (17)

LT

−0.2960 (17)

−0.0382 ++ (14)

0.2244 + (17)

−0.2952 (17)

LU

-

-

-

-

LV (Possibly under-investing)

2.2416*** (17)

1.2130*** + (14)

2.0308*** (17)

2.2929*** (17)

MT

-

-

-

-

NL

−0.4506 ++ (12)

−3.3452 (8)

−0.9267 + (9)

0.3556 +++ (12)

NO (Under-investing)

0.7826** (22)

0.5875*** ++ (16)

0.6417*** ++ (17)

0.3892* +++ (22)

PL (Possibly over-investing)

0.0113 + (17)

−0.0532 (15)

−0.1785* +++ (17)

0.0568 + (17)

PT

−0.0632 ++ (17)

−0.0599 +++ (17)

−0.0506 + (17)

−0.0718 + (17)

RO

−2.0451 (16)

−0.0047 (15)

−0.3388 (16)

−2.3211 (16)

SE (Under-investing)

0.1100** ++ (21)

0.1280 (16)

0.1997** ++ (18)

0.1720*** ++ (21)

SI

1.5843 + (20)

1.2281 ++ (16)

0.9800 ++ (20)

0.8841 +++ (20)

SK

−2.7676 ++ (20)

−2.9167 +++ (14)

−2.1368 ++ (19)

−2.6066 ++ (20)

UK

−0.0851 (19)

−0.2981 + (19)

−0.1417 (19)

−0.3252 (19)

Error-correction term

−0.7258

−0.8426

−0.7985

−0.8053

Adjusted R2 (long-run)

0.955

0.968

0.977

0.977

Adjusted R2 (short-run)

0.654

0.723

0.722

0.739

F-statistic (long-run)

333.9

208.9

578.1

458.1

F-statistic (short-run)

12.1

13.5

14.7

19.8

  1. For country-specific coefficients:
  2. Number of observations in the long-run equation given in brackets
  3. ***, ** and * indicate significance at the 1 %, 5 % and 10 % levels, respectively
  4. +++, ++ and + indicate equations where the null hypothesis of a unit root in the long-run residuals is rejected at the 1 %, 5 % and 10 % levels, respectively (i.e., a test for cointegration)