Asset [and Infrastructure Service(s)] | Scenario | Construction | Prerequisites/Constraints |
---|---|---|---|
Expanded Heathrow [Transport (air)] | Do minimum | Planned delivery by 2026 | Mutually exclusive to Thames Hub Vision airport |
TE2100 flood protection measures [Water (flood)] | All (with restrictions) | Plan until 2170; barrier delivery by 2070 | Benefits negate/negated by Thames Hub Vision barrier |
High Speed 2 [Transport (rail)] | All | Planned delivery by 2032 | Non assumed |
Lower Thames Crossing [Transport (road)] | All | Under consultation | Non assumed |
Crossrail [Transport (rail)] | All | Planned delivery by 2019 | Non assumed |
Thames Hub Vision road upgrades [Transport (road)] | Thames Hub Vision scenarios | Planned delivery by 2014 | Some road upgrades necessary to allow construction of other Thames Hub Vision elements |
Thames Hub Vision barrier [Transport (road and rail), Energy (generation), Water (flood)] | Thames Hub Vision scenarios | Planned delivery by 2015 | Requires some road upgrades, prerequisite for rail orbital; flood benefits negate/negated by TE2100 barrier |
Thames Hub Vision rail orbital [Transport (rail)] | Thames Hub Vision scenarios | Planned delivery by 2019 | Requires some road upgrades and barrier |
Thames Hub Vision airport [Transport (air)] | Thames Hub Vision scenarios | Planned delivery by 2028 | Requires some road upgrades for construction; requires barrier crossing and either the rail orbital or major road upgrades to operate at full capacity; mutually exclusive to Thames Hub Vision airport |